GB KERN KFP_V20 Version 2.0 10/2014 Operating Instruction Platforms Tabel of contents 1 Safety precautions ...
1 General • These installation instructions cover all information required for the installation and start-up of the following platforms: KERN KFP 6
3 Setting up the weighing platform 3.1 Selecting the site of installation • The surface must be able to bear the weighing platform under maxi-mum
3.3 Protect screw (Exemplification) ≤ 30 kg KERN KFP KFP 6V20M, KFP 6V20LM, KFP 15V20M: 1. 2. Sealed Screws may not be loosened (see figure).
3.4 Packaging / return transport Keep all parts of the original packaging for a pos-sibly required return. Only use original packaging for re
3.7 Connecting to the weighing terminal Deadweight cell output KERN KFP weighing platform connection EXC+(5V) See marking of the deadweight cell EX
5 Cleaning Clean the weighing platform with a soft cloth soaked with a mild cleaning agent. Take off the load panel and remove any dirt and f
6.3 Preload, Deadload and Overload settings Kern model max. Preload* (kg) * = additional initial load Deadload** (kg) **= initial load placed earlie